top of page

Piperville Road to be closed on May 3 for replacement of Bearbrook creek bridge.


Piperville Road will be fully closed between Farmers way and Russell Road and detour will be in place via Anderson Road, Leitrim Road and Russel Road, with a total length of 15.1 km. As part of communication to general public and residents, City staff will provide Construction Notices before commencement of construction and PVMS signs will be placed 2 weeks in advance before the detour is in place. The road will be close for at least 6 to 8 months.


Advance Environmental and In-water works (Occasional single lane closures with flagging) : Feb 22nd to March 15th

Construction Start (Full Closure of Piperville Road): May 3, 2021

Construction Finish – End of December 2021


--


Le chemin Piperville sera entièrement fermé entre le chemin Farmers et le chemin Russell et un détour sera en place par le chemin Anderson, le chemin Leitrim et le chemin Russell, d'une longueur totale de 15,1 km. Le pont sur le chemin sera remplacé. Dans le cadre de la communication avec le public et les résidents, le personnel de la Ville fournira des avis de construction avant le début de la construction et des panneaux seront placés 2 semaines à l'avance avant la mise en place du détour. Le chemin Piperville sera fermé pendant une période de 6 à 8 mois.


226 views0 comments
bottom of page